The case is within the arguments “in opposition to” with the lawyer Gael d’Albenas, licensed by the affiliation Bancs Publics.

On this Monday morning, anti-parking activists once more labored from 6am across the kiosk sq. to roll away building tools. Municipal police and inexperienced vests stood going through one another for hours, all the time chanting the identical factor: “It is unlawful!”. Replace this place along with your lawyer Gael d’Albenas, a specialist in city planning and environmental legislation, a really technical area.

Arguments

“The primary argument, town’s argument, is that they had been elected underneath this program to make parking, however the legitimacy of the election doesn’t assure legality.. Clarify to the lawyer. The second argument that’s important for Bancs Publics is the environmental side. We consider that it’s not possible to develop timber in containers. You want timber within the floor.” She continues. She additionally particulars the environmental weight of synthetic basement enchancment, a facet she says will not be taken into consideration on this case.

concreting

“Final yr, a local weather legislation on synthetic tillage was issued, which prohibits synthetic tillage and subsoil. explains Gael d’Albenas. Concreting causes environmental injury, particularly water. After we do not take into consideration the passage of water, it creates huge issues. In Sète, within the metropolis middle, we are going to take away greater than thirty thousand cubic meters of land. With out taking any compensatory measures. Furthermore, within the Dreal paperwork, Regional Directorate for Setting, Planning and Housing, we see that the water financial system was not taken into consideration in the course of the building this concrete block.

Usefulness questionable

Lastly, the lawyer develops an argument in opposition to the automobile park itself. “We surprise concerning the usefulness of this automobile park within the middle of Sète”she explains. For Public Benches, such a improvement is totally unjustified. “To start with, for security causes, this undertaking might have been carried out thirty years in the past.” Troublesome visitors, bottleneck, entry safety, no want for this construction, different underused automobile parks…arguments abound. “At the moment, the pattern is not to carry automobiles into town middle. The municipality responds by eradicating the parking zone to accommodate it beneath. However this has nothing to do with the brand new approach to management the motion of automobiles from town middle. by creating parking heaps outdoors. Subsequently, we dispute its usefulness, particularly since it’s an island.”concludes Grasp Albenas.

Sliced ​​Venture

To maneuver ahead in its battle, the affiliation faces “little drawback” administrative. “The undertaking is minimize, explains the lawyer. “EThey did not have something in January. The court docket then famous that these permits can be filed and that there was no have to droop work as there have been merely no permits. Since then, permits have been submitted by the mayor’s workplace one after the other, and never for your entire undertaking, which might have been extra logical from a authorized viewpoint. On August 29, the mayor’s workplace filed three such permits. Concerning the kiosk, timber and underground parking. Instructions for suspension and cancellation had been filed on September 12 on this regard. The case will probably be heard on September 30. Whereas activists don’t agree that the work continues.

City Corridor Celebration

On the facet of the city corridor it’s repeated that: “At the moment we have now all of the permissions to begin work within the related elements, and nothing prevents the work from shifting ahead.”